Difference between revisions of "Biogas-Plant/C3/Material-required-to-construct-a-Biogas-plant/English"
Bellatony911 (Talk | contribs) |
Nancyvarkey (Talk | contribs) |
||
Line 133: | Line 133: | ||
15. Wooden square trowel with a concave bent from inside. | 15. Wooden square trowel with a concave bent from inside. | ||
− | |||
− | * smoothening the '''cement''' plaster on the dome of the '''Biogas plant''' | + | : These are especially used for- |
+ | |||
+ | * smoothening the '''cement''' plaster | ||
+ | *on the dome of the '''Biogas plant''' | ||
|- | |- | ||
Line 170: | Line 172: | ||
| style="background-color:transparent;border:0.75pt solid #000000;padding:0.071cm;"| [[Image:]] | | style="background-color:transparent;border:0.75pt solid #000000;padding:0.071cm;"| [[Image:]] | ||
| style="background-color:transparent;border:0.75pt solid #000000;padding:0.071cm;"| | | style="background-color:transparent;border:0.75pt solid #000000;padding:0.071cm;"| | ||
− | 22. | + | 22. 1 measuring tape |
|- | |- | ||
Line 187: | Line 189: | ||
Animation - show an Iron rod with hollow ends | Animation - show an Iron rod with hollow ends | ||
| style="background-color:transparent;border:0.75pt solid #000000;padding:0.071cm;"| | | style="background-color:transparent;border:0.75pt solid #000000;padding:0.071cm;"| | ||
− | 25. Iron rod with hollow ends at | + | 25. Iron rod with hollow ends at either sides |
|- | |- | ||
Line 199: | Line 201: | ||
|- | |- | ||
| style="background-color:transparent;border:0.75pt solid #000000;padding:0.071cm;"| [[Image:]] | | style="background-color:transparent;border:0.75pt solid #000000;padding:0.071cm;"| [[Image:]] | ||
− | | style="background-color:transparent;border:0.75pt solid #000000;padding:0.071cm;"| | + | | style="background-color:transparent;border:0.75pt solid #000000;padding:0.071cm;"| We require- |
1. Main gas control valve of size 1 inch | 1. Main gas control valve of size 1 inch | ||
Line 205: | Line 207: | ||
| style="background-color:transparent;border:0.75pt solid #000000;padding:0.071cm;"| [[Image:]] | | style="background-color:transparent;border:0.75pt solid #000000;padding:0.071cm;"| [[Image:]] | ||
| style="background-color:transparent;border:0.75pt solid #000000;padding:0.071cm;"| | | style="background-color:transparent;border:0.75pt solid #000000;padding:0.071cm;"| | ||
− | |||
2. Metal pipe- | 2. Metal pipe- | ||
− | * To be connected from the center of the dome- 30 cms x 1 inch diameter | + | * To be connected from the center of the dome- 30 cms x 1 inch of diameter |
* This will be the main gas pipe | * This will be the main gas pipe | ||
Line 214: | Line 215: | ||
| style="background-color:transparent;border:0.75pt solid #000000;padding:0.071cm;"| [[Image:]] | | style="background-color:transparent;border:0.75pt solid #000000;padding:0.071cm;"| [[Image:]] | ||
| style="background-color:transparent;border:0.75pt solid #000000;padding:0.071cm;"| | | style="background-color:transparent;border:0.75pt solid #000000;padding:0.071cm;"| | ||
− | |||
3. Gas conveyer pipe of 1/2 inch diameter | 3. Gas conveyer pipe of 1/2 inch diameter | ||
− | * The length of this pipe will depend upon | + | * The length of this pipe will depend upon |
* the distance between '''Biogas plant '''and the kitchen | * the distance between '''Biogas plant '''and the kitchen | ||
Line 252: | Line 252: | ||
| style="background-color:transparent;border:0.75pt solid #000000;padding:0.071cm;"| [[Image:]] | | style="background-color:transparent;border:0.75pt solid #000000;padding:0.071cm;"| [[Image:]] | ||
| style="background-color:transparent;border:0.75pt solid #000000;padding:0.071cm;"| | | style="background-color:transparent;border:0.75pt solid #000000;padding:0.071cm;"| | ||
− | 6. We also | + | 6. We also require Safety-valve of 1 inch |
|- | |- | ||
| style="background-color:transparent;border:0.75pt solid #000000;padding:0.071cm;"| [[Image:]] | | style="background-color:transparent;border:0.75pt solid #000000;padding:0.071cm;"| [[Image:]] | ||
| style="background-color:transparent;border:0.75pt solid #000000;padding:0.071cm;"| | | style="background-color:transparent;border:0.75pt solid #000000;padding:0.071cm;"| | ||
− | 7. Approximately, 6 mtrs of rubber hose pipe of ½ inch diameter | + | 7. Approximately, 6 mtrs of rubber hose pipe of ½ inch diameter |
This rubber hose pipe will be used to convey the gas- | This rubber hose pipe will be used to convey the gas- | ||
Line 283: | Line 283: | ||
| style="background-color:transparent;border:0.75pt solid #000000;padding:0.071cm;"| [[Image:]][[Image:]][[Image:]] | | style="background-color:transparent;border:0.75pt solid #000000;padding:0.071cm;"| [[Image:]][[Image:]][[Image:]] | ||
− | | style="background-color:transparent;border:0.75pt solid #000000;padding:0.071cm;"| Always use good quality | + | | style="background-color:transparent;border:0.75pt solid #000000;padding:0.071cm;"| Always use good quality cement, gravel and sand. |
These are really important for the durability of the '''Biogas plant.''' | These are really important for the durability of the '''Biogas plant.''' | ||
Line 329: | Line 329: | ||
|- | |- | ||
| style="background-color:transparent;border:0.75pt solid #000000;padding:0.071cm;"| <center>[[Image:]]</center> | | style="background-color:transparent;border:0.75pt solid #000000;padding:0.071cm;"| <center>[[Image:]]</center> | ||
− | | style="background-color:transparent;border:0.75pt solid #000000;padding:0.071cm;"| The total number of days required to complete the civil work of a '''Biogas plant '''are 3 - 5 days. | + | | style="background-color:transparent;border:0.75pt solid #000000;padding:0.071cm;"| |
+ | *The total number of days required to complete | ||
+ | *the civil work of a '''Biogas plant '''are 3 - 5 days. | ||
|- | |- | ||
Line 337: | Line 339: | ||
* Between '''November '''and '''June'''. | * Between '''November '''and '''June'''. | ||
+ | |||
Constructing '''Biogas plants''' during the rainy season is best avoided, as it becomes messy. | Constructing '''Biogas plants''' during the rainy season is best avoided, as it becomes messy. | ||
Line 342: | Line 345: | ||
|- | |- | ||
| style="background-color:transparent;border:0.75pt solid #000000;padding:0.071cm;"| | | style="background-color:transparent;border:0.75pt solid #000000;padding:0.071cm;"| | ||
− | | style="background-color:transparent;border:0.75pt solid #000000;padding:0.071cm;"| This brings us to the end of this | + | | style="background-color:transparent;border:0.75pt solid #000000;padding:0.071cm;"| This brings us to the end of this tutorial on the material required to construct a '''Biogas plant'''. |
− | |||
− | + | The construction part of the '''Biogas plant''' will be explained in next tutorial, under the same series | |
|- | |- | ||
Line 362: | Line 364: | ||
* Number of days required | * Number of days required | ||
− | * | + | * Along with the best time to construct the plant |
| style="background-color:transparent;border:0.75pt solid #000000;padding:0.071cm;"| | | style="background-color:transparent;border:0.75pt solid #000000;padding:0.071cm;"| | ||
Line 377: | Line 379: | ||
* Number of days required | * Number of days required | ||
− | * | + | * Along with the best time to construct the plant |
|- | |- |
Latest revision as of 15:13, 1 June 2016
|
Narration |
Slide Number 1
Procedure to construct a Biogas plant. |
Hello friends.
Welcome to the Spoken Tutorial on Material required to construct a Biogas plant. |
Slide Number 2
Learning Objective
|
In this tutorial, we will learn about
|
Let us begin | Let us begin. |
Slide no. 3
Where to procure the materials from? |
The materials required to construct a Biogas plant-
|
Slide no. 4
Material required to construct a Biogas plant? |
The following material are required to construct the plant: |
[[Image:]] |
1. Cement 14 packs |
[[Image:]] |
2. Gravel - ½ brass |
[[Image:]] |
3. Sand - 1 brass |
[[Image:]] |
4. Three bundles of Chicken mesh, 30 feet each |
[[Image:]] |
5. Weldmesh sheet of size 3 ft x 4 ft with 1 inch x 1 inch of the hole size |
[[Image:]] |
6. Twelve feet of 6 mm Steel rods- 35 kgs |
[[Image:]] |
7. One kg of Steel wire- to be cut into 7-8 inches per piece |
[[Image:]] |
8. Bricks- 3 |
[[Image:]] |
9. Two kg of White cement |
Image of one kg packet of Lime Powder |
10. One kg of Lime powder |
[[Image:]] |
11. Jute gunny bags- 25 (approx.) |
[[Image:]] |
12. Plastic sheet- 13 feet x 10 feet |
[[Image:]] |
13. Seven Bamboo sticks of approx. size - 3.5 ft |
Adequate Water |
14. Liquid waterproofing material - 1 Ltr |
[[Image:]]
[[Image:]] Point an arrow in the middle of the trowel to show the concave bent |
15. Wooden square trowel with a concave bent from inside.
|
[[Image:]] |
16. Metal square trowel |
[[Image:]] |
17. Shovel |
[[Image:]] |
18. Small trowel |
[[Image:]] |
19. Hook |
[[Image:]] |
20. Trough with a capacity of 10 kgs |
[[Image:]] |
21. Scissor to cut the chicken mesh |
[[Image:]] |
22. 1 measuring tape |
[[Image:]] |
23. One kg of Newspaper |
[[Image:]] |
24. Scale with two hooves at the two ends |
[[Image:]]
Animation - show an Iron rod with hollow ends |
25. Iron rod with hollow ends at either sides |
[[Image:]][[Image:]][[Image:]] | We will now look at other items required to construct the plant such as-
|
[[Image:]] | We require-
1. Main gas control valve of size 1 inch |
[[Image:]] |
2. Metal pipe-
|
[[Image:]] |
3. Gas conveyer pipe of 1/2 inch diameter
|
[[Image:]] |
4. Inlet pipe connected from Mixing tank to Digester tank-
|
Image of the pipe in a horizontal position [[Image:]] |
5. Another outlet pipe of 6 inches diameter
|
[[Image:]] |
If the outlet pipe is not required, alternately, construct a drain-
|
[[Image:]] |
6. We also require Safety-valve of 1 inch |
[[Image:]] |
7. Approximately, 6 mtrs of rubber hose pipe of ½ inch diameter This rubber hose pipe will be used to convey the gas-
|
[[Image:]] |
8. Two Vohj clips are required to secure the pipe. |
[[Image:]] |
9. A few other items like-
|
[[Image:]] |
10. And Teflon tape |
[[Image:]][[Image:]][[Image:]] | Always use good quality cement, gravel and sand.
These are really important for the durability of the Biogas plant. |
Let’s now talk about the-
| |
[[Image:]] | To construct the Biogas plant, we need approx. 12ft X 8 ft of land, near the house. |
[[Image:]] | The site should be such that-
|
[[Image:]][[Image:]] | The selected site should also ensure easy operation and maintenance of -
|
The site should also be located-
This will help to easily operate the plant and avoid wastage of raw materials. | |
|
|
Show full year calendar | The best time of the year to construct the Biogas plant is-
|
This brings us to the end of this tutorial on the material required to construct a Biogas plant.
| |
Let’s Summarize- In this tutorial, we learnt
|
Let’s Summarize- In this tutorial, we learnt
|
Slide 16
Acknowledgements This video was created by: Spoken Tutorial project with inputs from Rural-ICT team, IIT Bombay |
This video was created by-
Spoken tutorial Project with inputs from Rural-ICT team, IIT Bombay. |
More information on these projects can be found at these links | More information on these projects can be found at these links. |
Pictures and technology support: Courtesy: Bhagirath Rural Development Foundation Village- Zarap, Taluka- Kudal, Dist.- Sindhudurg |
Pictures and technology support: Courtesy: Bhagirath Rural Development Foundation Village- Zarap, Taluka- Kudal, Dist.- Sindhudurg |
This is Bella Tony along with the animation team of the Spoken Tutorial project signing off.
Thank you for joining. |