* The various materials required to construct a '''Biogas plant'''
 
* The various materials required to construct a '''Biogas plant'''
* Area required to build the plant
+
* Area required to construct the plant
 
* The site  
 
* The site  
 
* Number of days required for construction  
 
* Number of days required for construction  
Line 26: Line 26:
  
 
* The various materials required to construct a '''Biogas plant'''
 
* The various materials required to construct a '''Biogas plant'''
* Area required to build the plant
+
* Area required to construct the plant
 
* The site  
 
* The site  
 
* Number of days required for construction  
 
* Number of days required for construction  
Line 133: Line 133:
 
15. Wooden square trowel with a concave bent from inside.  
 
15. Wooden square trowel with a concave bent from inside.  
  
* These are especially used for-
 
  
* smoothening the '''cement''' plaster on the dome of the '''Biogas plant'''
+
: These are especially used for-
 +
 
 +
* smoothening the '''cement''' plaster  
 +
*on the dome of the '''Biogas plant'''
  
 
|-
 
|-
Line 170: Line 172:
 
| style="background-color:transparent;border:0.75pt solid #000000;padding:0.071cm;"| [[Image:]]
 
| style="background-color:transparent;border:0.75pt solid #000000;padding:0.071cm;"| [[Image:]]
 
| style="background-color:transparent;border:0.75pt solid #000000;padding:0.071cm;"|  
 
| style="background-color:transparent;border:0.75pt solid #000000;padding:0.071cm;"|  
22. Measuring tape -1 no.
+
22. 1 measuring tape
  
 
|-
 
|-
Line 187: Line 189:
 
Animation - show an Iron rod with hollow ends  
 
Animation - show an Iron rod with hollow ends  
 
| style="background-color:transparent;border:0.75pt solid #000000;padding:0.071cm;"|  
 
| style="background-color:transparent;border:0.75pt solid #000000;padding:0.071cm;"|  
25. Iron rod with hollow ends at the either sides  
+
25. Iron rod with hollow ends at either sides  
  
 
|-
 
|-
Line 199: Line 201:
 
|-
 
|-
 
| style="background-color:transparent;border:0.75pt solid #000000;padding:0.071cm;"| [[Image:]]
 
| style="background-color:transparent;border:0.75pt solid #000000;padding:0.071cm;"| [[Image:]]
| style="background-color:transparent;border:0.75pt solid #000000;padding:0.071cm;"|  
+
| style="background-color:transparent;border:0.75pt solid #000000;padding:0.071cm;"| We require-
 
1. Main gas control valve of size 1 inch
 
1. Main gas control valve of size 1 inch
  
Line 205: Line 207:
 
| style="background-color:transparent;border:0.75pt solid #000000;padding:0.071cm;"| [[Image:]]
 
| style="background-color:transparent;border:0.75pt solid #000000;padding:0.071cm;"| [[Image:]]
 
| style="background-color:transparent;border:0.75pt solid #000000;padding:0.071cm;"|  
 
| style="background-color:transparent;border:0.75pt solid #000000;padding:0.071cm;"|  
 
 
2. Metal pipe-
 
2. Metal pipe-
* To be connected from the center of the dome- 30 cms x 1 inch diameter
+
* To be connected from the center of the dome- 30 cms x 1 inch of diameter
  
 
* This will be the main gas pipe  
 
* This will be the main gas pipe  
Line 214: Line 215:
 
| style="background-color:transparent;border:0.75pt solid #000000;padding:0.071cm;"| [[Image:]]
 
| style="background-color:transparent;border:0.75pt solid #000000;padding:0.071cm;"| [[Image:]]
 
| style="background-color:transparent;border:0.75pt solid #000000;padding:0.071cm;"|  
 
| style="background-color:transparent;border:0.75pt solid #000000;padding:0.071cm;"|  
 
 
3. Gas conveyer pipe of 1/2 inch diameter  
 
3. Gas conveyer pipe of 1/2 inch diameter  
  
* The length of this pipe will depend upon-
+
* The length of this pipe will depend upon
 
* the distance between '''Biogas plant '''and the kitchen
 
* the distance between '''Biogas plant '''and the kitchen
  
Line 252: Line 252:
 
| style="background-color:transparent;border:0.75pt solid #000000;padding:0.071cm;"| [[Image:]]
 
| style="background-color:transparent;border:0.75pt solid #000000;padding:0.071cm;"| [[Image:]]
 
| style="background-color:transparent;border:0.75pt solid #000000;padding:0.071cm;"|  
 
| style="background-color:transparent;border:0.75pt solid #000000;padding:0.071cm;"|  
6. We also required Safety-valve of 1 inch
+
6. We also require Safety-valve of 1 inch
  
 
|-
 
|-
 
| style="background-color:transparent;border:0.75pt solid #000000;padding:0.071cm;"| [[Image:]]
 
| style="background-color:transparent;border:0.75pt solid #000000;padding:0.071cm;"| [[Image:]]
 
| style="background-color:transparent;border:0.75pt solid #000000;padding:0.071cm;"|  
 
| style="background-color:transparent;border:0.75pt solid #000000;padding:0.071cm;"|  
7. Approximately, 6 mtrs of rubber hose pipe of ½ inch diameter.
+
7. Approximately, 6 mtrs of rubber hose pipe of ½ inch diameter
  
 
This rubber hose pipe will be used to convey the gas-
 
This rubber hose pipe will be used to convey the gas-
Line 283: Line 283:
 
| style="background-color:transparent;border:0.75pt solid #000000;padding:0.071cm;"| [[Image:]][[Image:]][[Image:]]
 
| style="background-color:transparent;border:0.75pt solid #000000;padding:0.071cm;"| [[Image:]][[Image:]][[Image:]]
  
| style="background-color:transparent;border:0.75pt solid #000000;padding:0.071cm;"| Always use good quality '''cement''', gravel and sand.
+
| style="background-color:transparent;border:0.75pt solid #000000;padding:0.071cm;"| Always use good quality cement, gravel and sand.
  
 
These are really important for the durability of the '''Biogas plant.'''
 
These are really important for the durability of the '''Biogas plant.'''
Line 329: Line 329:
 
|-
 
|-
 
| style="background-color:transparent;border:0.75pt solid #000000;padding:0.071cm;"| <center>[[Image:]]</center>
 
| style="background-color:transparent;border:0.75pt solid #000000;padding:0.071cm;"| <center>[[Image:]]</center>
| style="background-color:transparent;border:0.75pt solid #000000;padding:0.071cm;"| The total number of days required to complete the civil work of a '''Biogas plant '''are 3 - 5 days.
+
| style="background-color:transparent;border:0.75pt solid #000000;padding:0.071cm;"|  
 +
*The total number of days required to complete  
 +
*the civil work of a '''Biogas plant '''are 3 - 5 days.
  
 
|-
 
|-
Line 337: Line 339:
  
 
* Between '''November '''and '''June'''.
 
* Between '''November '''and '''June'''.
 +
  
 
Constructing '''Biogas plants''' during the rainy season is best avoided, as it becomes messy.
 
Constructing '''Biogas plants''' during the rainy season is best avoided, as it becomes messy.
Line 342: Line 345:
 
|-
 
|-
 
| style="background-color:transparent;border:0.75pt solid #000000;padding:0.071cm;"|  
 
| style="background-color:transparent;border:0.75pt solid #000000;padding:0.071cm;"|  
| style="background-color:transparent;border:0.75pt solid #000000;padding:0.071cm;"| This brings us to the end of this''' tutorial''' on the material required to construct a '''Biogas plant'''.
+
| style="background-color:transparent;border:0.75pt solid #000000;padding:0.071cm;"| This brings us to the end of this tutorial on the material required to construct a '''Biogas plant'''.
  
The construction part of the '''Biogas plant'''-
 
  
will be explained in next''' tutorial '''under the same series
+
The construction part of the '''Biogas plant''' will be explained in next tutorial, under the same series
  
 
|-
 
|-
Line 362: Line 364:
 
* Number of days required  
 
* Number of days required  
  
* And best time to construct the plant
+
* Along with the best time to construct the plant
  
 
| style="background-color:transparent;border:0.75pt solid #000000;padding:0.071cm;"|  
 
| style="background-color:transparent;border:0.75pt solid #000000;padding:0.071cm;"|  
Line 377: Line 379:
 
* Number of days required  
 
* Number of days required  
  
* And best time to construct the plant
+
* Along with the best time to construct the plant
  
 
|-
 
|-

Latest revision as of 15:13, 1 June 2016

Visual Cue
Narration
Slide Number 1

Procedure to construct a Biogas plant.

Hello friends.

Welcome to the Spoken Tutorial on Material required to construct a Biogas plant.

Slide Number 2

Learning Objective

  • The various materials required to construct a Biogas plant
  • Area required to construct the plant
  • The site
  • Number of days required for construction
  • And the best time to construct the plant
In this tutorial, we will learn about
  • The various materials required to construct a Biogas plant
  • Area required to construct the plant
  • The site
  • Number of days required for construction
  • And the best time to construct the plant
Let us begin Let us begin.
Slide no. 3

Where to procure the materials from?

The materials required to construct a Biogas plant-
  • can be procured from any hardware & cement shop.
Slide no. 4

Material required to construct a Biogas plant?

The following material are required to construct the plant:
[[Image:]]

1. Cement 14 packs

[[Image:]]

2. Gravel - ½ brass

[[Image:]]

3. Sand - 1 brass

[[Image:]]

4. Three bundles of Chicken mesh, 30 feet each

[[Image:]]

5. Weldmesh sheet of size 3 ft x 4 ft with 1 inch x 1 inch of the hole size

[[Image:]]

6. Twelve feet of 6 mm Steel rods- 35 kgs

[[Image:]]

7. One kg of Steel wire- to be cut into 7-8 inches per piece

[[Image:]]

8. Bricks- 3

[[Image:]]

9. Two kg of White cement

Image of one kg packet of Lime Powder

10. One kg of Lime powder

[[Image:]]

11. Jute gunny bags- 25 (approx.)

[[Image:]]

12. Plastic sheet- 13 feet x 10 feet

[[Image:]]

13. Seven Bamboo sticks of approx. size - 3.5 ft

Adequate Water

14. Liquid waterproofing material - 1 Ltr

[[Image:]]

[[Image:]]

Point an arrow in the middle of the trowel to show the concave bent

15. Wooden square trowel with a concave bent from inside.


These are especially used for-
  • smoothening the cement plaster
  • on the dome of the Biogas plant
[[Image:]]

16. Metal square trowel

[[Image:]]

17. Shovel

[[Image:]]

18. Small trowel

[[Image:]]

19. Hook

[[Image:]]

20. Trough with a capacity of 10 kgs

[[Image:]]

21. Scissor to cut the chicken mesh

[[Image:]]

22. 1 measuring tape

[[Image:]]

23. One kg of Newspaper

[[Image:]]

24. Scale with two hooves at the two ends

[[Image:]]

Animation - show an Iron rod with hollow ends

25. Iron rod with hollow ends at either sides

[[Image:]][[Image:]][[Image:]] We will now look at other items required to construct the plant such as-
  • tubes,
  • pipes and
  • valves
[[Image:]] We require-

1. Main gas control valve of size 1 inch

[[Image:]]

2. Metal pipe-

  • To be connected from the center of the dome- 30 cms x 1 inch of diameter
  • This will be the main gas pipe
[[Image:]]

3. Gas conveyer pipe of 1/2 inch diameter

  • The length of this pipe will depend upon
  • the distance between Biogas plant and the kitchen
[[Image:]]

4. Inlet pipe connected from Mixing tank to Digester tank-

  • Should be 6 inches diameter and approx. 5 feet of length

Image of the pipe in a horizontal position

[[Image:]]

5. Another outlet pipe of 6 inches diameter

  • To be connected from slurry tank to the slurry collection pit
[[Image:]]

If the outlet pipe is not required, alternately, construct a drain-

  • Between slurry tank and the slurry collection pit as shown.
  • The depth of this slurry collection pit can be between 4 to 6 feet.
  • The slurry collected in this pit can be manually poured in the fields.
[[Image:]]

6. We also require Safety-valve of 1 inch

[[Image:]]

7. Approximately, 6 mtrs of rubber hose pipe of ½ inch diameter

This rubber hose pipe will be used to convey the gas-

  • from the safety valve to the kitchen stove
[[Image:]]

8. Two Vohj clips are required to secure the pipe.

[[Image:]]

9. A few other items like-

  • Synthetic Resin Adhesive- 250 ml
[[Image:]]

10. And Teflon tape

[[Image:]][[Image:]][[Image:]] Always use good quality cement, gravel and sand.

These are really important for the durability of the Biogas plant.

Let’s now talk about the-
  • Area
  • Site
  • Number of days required for construction
  • And best time to construct the plant
[[Image:]] To construct the Biogas plant, we need approx. 12ft X 8 ft of land, near the house.
[[Image:]] The site should be such that-
  1. construction cost is minimized and
  2. it receives ample sunlight
  3. to maintain the right temperature inside the Biogas plant.
[[Image:]][[Image:]] The selected site should also ensure easy operation and maintenance of -
  1. Mixing tank
  2. Digester tank
  3. Main gas control valve to switch off gas inflow and
  4. Slurry tank
The site should also be located-
  • near to the source of animal dung
  • and the toilet.

This will help to easily operate the plant and avoid wastage of raw materials.

[[Image:]]
  • The total number of days required to complete
  • the civil work of a Biogas plant are 3 - 5 days.
Show full year calendar The best time of the year to construct the Biogas plant is-
  • Between November and June.


Constructing Biogas plants during the rainy season is best avoided, as it becomes messy.

This brings us to the end of this tutorial on the material required to construct a Biogas plant.


The construction part of the Biogas plant will be explained in next tutorial, under the same series

Let’s Summarize-

In this tutorial, we learnt

  • The material required to construct a Biogas plant
  • Area required to construct the plant
  • Preferred site and
  • Number of days required
  • Along with the best time to construct the plant

Let’s Summarize-

In this tutorial, we learnt

  • The material required to construct a Biogas plant
  • Area required to construct the plant
  • Preferred site and
  • Number of days required
  • Along with the best time to construct the plant
Slide 16

Acknowledgements

This video was created by:

Spoken Tutorial project with inputs from Rural-ICT team, IIT Bombay

This video was created by-

Spoken tutorial Project with inputs from Rural-ICT team, IIT Bombay.

More information on these projects can be found at these links

http://spoken-tutorial.org/NMEICT-Intro

http://ruralict.cse.iitb.ac.in/ in

More information on these projects can be found at these links.

http://spoken-tutorial.org/NMEICT-Intro

http://ruralict.cse.iitb.ac.in/ in

Pictures and technology support:

Courtesy:

Bhagirath Rural Development Foundation

Village- Zarap, Taluka- Kudal,

Dist.- Sindhudurg

Pictures and technology support:

Courtesy:

Bhagirath Rural Development Foundation

Village- Zarap, Taluka- Kudal,

Dist.- Sindhudurg

This is Bella Tony along with the animation team of the Spoken Tutorial project signing off.

Thank you for joining.