(Created page with "{| border=1 | Time | Narration |- | 00:01 | Hello and Welcome to the '''Spoken Tutorial '''on Maintenance and Repair of the '''Biogas plant.''' |- | 00:10 | In this '''tutor...")
 
Line 5: Line 5:
 
|-
 
|-
 
| 00:01
 
| 00:01
| Hello and Welcome to the '''Spoken Tutorial '''on Maintenance and Repair of the '''Biogas plant.'''
+
| Hello and welcome to the '''Spoken Tutorial '''on '''Maintenance and Repair''' of the '''Biogas plant.'''
  
 
|-
 
|-
 
| 00:10
 
| 00:10
| In this '''tutorial, '''we will learn different techniques to maintain and repair-  the '''Biogas plant''' and  the '''Biogas''' burner
+
| In this tutorial, we will learn different techniques to maintain and repair-  the biogas plant and  the '''biogas burner'''.
  
 
|-
 
|-
 
| 00:27
 
| 00:27
| Periodic partial and complete cleaning of the '''Biogas plant''' is a must.  
+
| Periodic partial and complete cleaning of the biogas plant is a must.  
 
    
 
    
 
|-
 
|-
 
| 00:36
 
| 00:36
|This will ensure that the '''Biogas plant''' runs smoothly.
+
|This will ensure that the biogas plant runs smoothly.
  
 
|-
 
|-
 
| 00:43
 
| 00:43
|It will also ensure efficient working of the '''Biogas plant '''for many years.
+
|It will also ensure efficient working of the biogas plant for many years.
  
 
|-
 
|-
Line 29: Line 29:
 
|-
 
|-
 
| 00:58
 
| 00:58
| So, how often should one carry out maintenance of the '''Biogas plant'''?  
+
| So, how often should one carry out maintenance of the biogas plant?  
  
 
|-
 
|-
Line 41: Line 41:
 
|-
 
|-
 
| 01:25
 
| 01:25
| This will ensure- smooth flow of the bio-waste from the mixing tank into the digester tank.
+
| This will ensure smooth flow of the bio-waste from the mixing tank into the '''digester tank'''.
  
 
|-
 
|-
Line 61: Line 61:
 
|-
 
|-
 
| 02:18
 
| 02:18
|Soil, sand or stone should also not be added.
+
|Soil, sand or stone should also not be added
  
 
|-
 
|-
 
| 02:26
 
| 02:26
|As they will accumulate at the base of the digester and hinder gas production.
+
|as they will accumulate at the base of the '''digester''' and hinder gas production.
  
 
|-
 
|-
Line 77: Line 77:
 
|-
 
|-
 
| 02:47
 
| 02:47
|This will lead to shorter retention timei.e. bio-waste will be in the digester tank for lesser time and fermentation won’t be completed.  
+
|This will lead to shorter retention time i.e. bio-waste will be in the digester tank for lesser time and fermentation won’t be completed.  
  
 
|-
 
|-
Line 89: Line 89:
 
|-
 
|-
 
| 03:22
 
| 03:22
| Water condensation should be checked regularly.
+
| Water condensation should be checked regularly
  
 
|-
 
|-
 
| 03:27
 
| 03:27
| As water in the pipeline will block the passage of gas.
+
| as water in the pipeline will block the passage of gas.
  
 
|-
 
|-
Line 101: Line 101:
 
|-
 
|-
 
| 03:45
 
| 03:45
|Also keep a check that the slurry is being pumped out smoothly into the slurry tank.
+
|Also, keep a check that the slurry is being pumped out smoothly into the slurry tank.
  
 
|-
 
|-
Line 113: Line 113:
 
|-
 
|-
 
| 04:17
 
| 04:17
| Another important thing to be done is that- Slurry in the digester tank should be completely removed once in three years.
+
| Another important thing to be done is that- slurry in the digester tank should be completely removed once in three years.
  
 
|-
 
|-
Line 129: Line 129:
 
|-
 
|-
 
| 04:59
 
| 04:59
| Let us now look into the Repair section.
+
| Let us now look into the repair section.
  
 
|-
 
|-
 
| 05:06
 
| 05:06
|Repair of '''Biogas''' burner should always be done by a qualified technician.
+
|Repair of '''Biogas burner''' should always be done by a qualified technician.
  
 
|-
 
|-
 
| 05:15
 
| 05:15
| What you see here is a '''Biogas''' burner with the flame.  
+
| What you see here is a biogas burner with the flame.  
  
 
|-
 
|-
 
| 05:22
 
| 05:22
| To start repairing, first switch off the inflow of gas by turning off the knobs on- the hose pipe and at the burner
+
| To start repairing, first switch off the inflow of gas by turning off the knobs on  the hose pipe and at the burner.
  
 
|-
 
|-
Line 209: Line 209:
 
|-
 
|-
 
| 07:58
 
| 07:58
|A ring with clean holes will ensuresmooth flow of gas and fuller flame
+
|A ring with clean holes will ensure smooth flow of gas and fuller flame.
  
 
|-
 
|-
Line 225: Line 225:
 
|-
 
|-
 
| 08:33
 
| 08:33
|Otherwise, the generated '''Biogas '''can escape into the atmosphere through these cracks.
+
|Otherwise, the generated biogas can escape into the atmosphere through these cracks.
  
 
|-
 
|-
Line 233: Line 233:
 
|-
 
|-
 
| 08:51
 
| 08:51
| Once in 3 years,  the mason also repaints the inner wall of the digester tank  
+
| Once in 3 years,  the mason also repaints the inner wall of the digester tank.
  
 
|-
 
|-
 
| 09:03
 
| 09:03
|This is done by using White '''cement''' and synthetic resin adhesive mixture
+
|This is done by using white cement and synthetic resin adhesive mixture.
  
 
|-
 
|-
Line 245: Line 245:
 
|-
 
|-
 
|09:23
 
|09:23
| To make this mixture use the following- 2 Ltrs of water
+
| To make this mixture use the following- 2 Liters of water,
 
+
 
|-
 
|-
 
| 09:33
 
| 09:33
| 250 gms of Synthetic Resin Adhesive and  2 kgs of white '''cement'''
+
| 250 gms of Synthetic Resin Adhesive and  2 kgs of white cement.
  
 
|-
 
|-
Line 257: Line 256:
 
|-
 
|-
 
| 09:54
 
| 09:54
|  Let us summarize: In this '''tutorial''' we learnt about different techniques to maintenance and repair the''' Biogas plant''' and the Biogas burner.
+
|  Let us summarize. In this tutorial, we learnt about different techniques of maintenance and repair of the biogas plant and the biogas burner.
  
 
|-
 
|-
Line 269: Line 268:
 
|-
 
|-
 
| 10:35
 
| 10:35
| This is Bella Tony along with the animation team of the '''Spoken''' '''Tutorial''' project signing off.
+
| This is Bella Tony, along with the animation team of the '''Spoken Tutorial''' project, signing off.
 
Thank you for joining.
 
Thank you for joining.
  
 
|}
 
|}

Revision as of 11:47, 29 November 2016

Time Narration
00:01 Hello and welcome to the Spoken Tutorial on Maintenance and Repair of the Biogas plant.
00:10 In this tutorial, we will learn different techniques to maintain and repair- the biogas plant and the biogas burner.
00:27 Periodic partial and complete cleaning of the biogas plant is a must.
00:36 This will ensure that the biogas plant runs smoothly.
00:43 It will also ensure efficient working of the biogas plant for many years.
00:52 Let us first look into the maintenance section.
00:58 So, how often should one carry out maintenance of the biogas plant?
01:07 Maintenance should be carried out on a daily basis by doing the following-
01:16 Always, mix the bio-waste with water in the proper ratio.
01:25 This will ensure smooth flow of the bio-waste from the mixing tank into the digester tank.
01:36 If adding plant waste, crush and chop the leaves up to 1-4 cms.
01:49 Do not feed too much straw into the digester tank as it is difficult to be digested.
02:00 Sticks and branches of trees should also be avoided.
02:08 Soap, oil, chemical, insecticide and pesticides should not be added.
02:18 Soil, sand or stone should also not be added
02:26 as they will accumulate at the base of the digester and hinder gas production.
02:34 Quantity of bio-waste to be supplied depends upon the size of the plant.
02:42 Too much bio-waste should not be fed into the digester.
02:47 This will lead to shorter retention time i.e. bio-waste will be in the digester tank for lesser time and fermentation won’t be completed.
03:04 Hence, bio-waste will come out in the slurry tank without being digested.
03:12 If less bio-waste is fed into the digester, then gas production will be low.
03:22 Water condensation should be checked regularly
03:27 as water in the pipeline will block the passage of gas.
03:33 Do so, by lifting the gas pipe so that the water can run back into the digester tank.
03:45 Also, keep a check that the slurry is being pumped out smoothly into the slurry tank.
03:55 Ensure that the slurry is being emptied out of the slurry tank when it is full.
04:04 No inflammable items like- lighter and/or cigarettes should be brought near the outlet pipe of the dome.
04:17 Another important thing to be done is that- slurry in the digester tank should be completely removed once in three years.
04:33 This is usually done by the mason himself.
04:40 As shown, keep the mixing tank and the slurry tank covered.
04:48 This is done to ensure proper hygiene and to avoid breeding of mosquitoes near the plant.
04:59 Let us now look into the repair section.
05:06 Repair of Biogas burner should always be done by a qualified technician.
05:15 What you see here is a biogas burner with the flame.
05:22 To start repairing, first switch off the inflow of gas by turning off the knobs on the hose pipe and at the burner.
05:39 Doing so is very important.
05:43 What you see here is the burner without the flame after the knobs have been turned off.
05:52 Wait for few minutes and light the burner to ensure that gas inflow has stopped.
06:03 Now remove the hose pipe connected to the burner.
06:09 Do so by loosening the Vohj clip tightened on the hose pipe connected to the burner.
06:19 Once it is loosened, pull out the hose pipe.
06:25 Now place the hose pipe near your ear to check for the sound of gas.
04:36 No sound means no gas inflow and the repair work can be carried out safely.
06:47 Now we start dismantling the burner.
06:53 Next we will remove the debris in the burner.
06:59 As shown in the image, blow air through the hose-burner connector.
07:09 This will also help to check if air is reaching smoothly to the flame ring.
07:19 Slightly tap the burner and then turn it upside down.
07:26 You can see the debris fallen from the burner.
07:33 In case of hard debris which cannot be removed by blowing air, a dry scrubbing pad can be used.
07:47 To clean the flame ring, use a pin and insert it into the holes for cleaning.
07:58 A ring with clean holes will ensure smooth flow of gas and fuller flame.
08:09 A clean ring will look like this.
08:15 Apart from what is mentioned, periodic inspection of the plant is necessary.
08:24 Inspection will help to locate cracks on the surface of the digester tank.
08:33 Otherwise, the generated biogas can escape into the atmosphere through these cracks.
08:43 Hence, these cracks need to be sealed quickly.
08:51 Once in 3 years, the mason also repaints the inner wall of the digester tank.
09:03 This is done by using white cement and synthetic resin adhesive mixture.
09:14 This mixture will also help to seal cracks, if present.
09:23 To make this mixture use the following- 2 Liters of water,
09:33 250 gms of Synthetic Resin Adhesive and 2 kgs of white cement.
09:49 Mix these thoroughly and use.
09:54 Let us summarize. In this tutorial, we learnt about different techniques of maintenance and repair of the biogas plant and the biogas burner.
10:13 This video was created by- Spoken Tutorial Project with inputs from Rural-ICT team, IIT Bombay.
10:26 More information on these projects can be found at these links.
10:35 This is Bella Tony, along with the animation team of the Spoken Tutorial project, signing off.

Thank you for joining.