Difference between revisions of "Biogas-Plant/C3/Material-required-to-construct-a-Biogas-plant/English-timed"
From Script | Spoken-Tutorial
PoojaMoolya (Talk | contribs) (Created page with "{| Border=1 | '''Time''' | '''Narration''' |- | 00:00 | Hello. Welcome to this spoken tutorial on Material required to construct a '''biogas plant''' |- | 00:09 | In th...") |
Sandhya.np14 (Talk | contribs) |
||
Line 5: | Line 5: | ||
|- | |- | ||
| 00:00 | | 00:00 | ||
− | | Hello. Welcome to this spoken tutorial on Material required to construct a | + | | Hello. Welcome to this '''spoken tutorial''' on '''Material required to construct a biogas plant'''. |
|- | |- | ||
| 00:09 | | 00:09 | ||
− | | In this tutorial, we will learn about the various materials required to construct a '''biogas plant''' | + | | In this tutorial, we will learn about: |
+ | * the various materials required to construct a '''biogas plant''' | ||
|- | |- | ||
| 00:18 | | 00:18 | ||
− | | Area required to construct the plant | + | |* Area required to construct the '''plant''' |
|- | |- | ||
| 00:22 | | 00:22 | ||
− | |The | + | |* The site |
+ | * No. of days required for construction and * | ||
+ | * the best time to construct the plant. | ||
|- | |- | ||
| 00:32 | | 00:32 | ||
− | | Let us begin. The materials required to construct a | + | | Let us begin. The materials required to construct a biogas plant can be procured from any hardware & cement shop. |
|- | |- | ||
Line 29: | Line 32: | ||
|- | |- | ||
|00:49 | |00:49 | ||
− | | Cement 14 packs | + | | Cement 14 packs, |
|- | |- | ||
|00:51 | |00:51 | ||
− | | Gravel – half brass | + | | Gravel – half brass, |
|- | |- | ||
| 00:55 | | 00:55 | ||
− | | Sand - 1 brass | + | | Sand - 1 brass, |
|- | |- | ||
| 00:57 | | 00:57 | ||
− | | 3 bundles of chicken mesh | + | | 3 bundles of chicken mesh- 30 feet each, |
|- | |- | ||
| 01:02 | | 01:02 | ||
− | | Weldmesh sheet of size 3 feet x 4 feet with 1 inch x 1 inch of the hole size | + | | Weldmesh sheet of size 3 feet x 4 feet with 1 inch x 1 inch of the hole size, |
|- | |- | ||
Line 53: | Line 56: | ||
|- | |- | ||
| 01:18 | | 01:18 | ||
− | | 1 kg of steel wire to be cut into | + | | 1 kg of steel wire to be cut into 7-8 inches per piece |
|- | |- | ||
| 01:27 | | 01:27 | ||
− | | Bricks 3, 2kg of white cement | + | | Bricks 3, 2kg of white cement, |
|- | |- | ||
|01:31 | |01:31 | ||
− | | 1 kg of lime powder | + | | 1 kg of lime powder, |
|- | |- | ||
| 01:34 | | 01:34 | ||
− | | Jute gunny bags | + | | Jute gunny bags- 25 approximately, |
|- | |- | ||
Line 81: | Line 84: | ||
|- | |- | ||
| 01:53 | | 01:53 | ||
− | | Wooden square trowel with a concave bent from inside | + | | Wooden square trowel with a concave bent from inside. |
|- | |- | ||
| 01:58 | | 01:58 | ||
− | | These are especially used for smoothening the cement plaster on the dome of the Biogas plant | + | | These are especially used for smoothening the cement plaster on the dome of the Biogas plant. |
|- | |- | ||
| 02:06 | | 02:06 | ||
− | | Metal square trowel | + | | Metal square trowel, |
|- | |- | ||
| 02:08 | | 02:08 | ||
− | | Shovel | + | | Shovel, |
|- | |- | ||
Line 101: | Line 104: | ||
|- | |- | ||
| 02:12 | | 02:12 | ||
− | | | + | | trough with a capacity of 10 kgs. |
|- | |- | ||
| 02:16 | | 02:16 | ||
− | | Scissor to cut the chicken mesh | + | | Scissor to cut the chicken mesh, |
|- | |- | ||
| 02:18 | | 02:18 | ||
− | | One Measuring tape | + | | One Measuring tape, |
|- | |- | ||
| 02:20 | | 02:20 | ||
− | | 1kg of Newspaper | + | | 1kg of Newspaper, |
|- | |- | ||
| 02:23 | | 02:23 | ||
− | | | + | | scale with two hooves at the two ends and |
|- | |- | ||
| 02:28 | | 02:28 | ||
− | | | + | | an iron rod with hollow ends at either sides. |
|- | |- | ||
| 02:33 | | 02:33 | ||
− | | We will now look at other items required to | + | | We will now look at other items required to build the plant such as tubes, pipes and valves. |
|- | |- | ||
| 02:45 | | 02:45 | ||
− | | We | + | | We require main gas control valve of size 1 inch, metal pipe to be connected from the center of the dome, 30 cms x 1 inch of diameter. |
|- | |- | ||
| 03:01 | | 03:01 | ||
− | | This will be the main gas pipe | + | | This will be the main gas pipe. |
|- | |- | ||
| 03:04 | | 03:04 | ||
− | | Gas | + | | Gas conveyor pipe of 1/2 inch diameter: |
|- | |- | ||
| 03:08 | | 03:08 | ||
− | | The length of this pipe will depend upon the distance between | + | | The length of this pipe will depend upon the distance between biogas plant and the kitchen. |
|- | |- | ||
| 03:17 | | 03:17 | ||
− | |Inlet pipe connected from ''' | + | |Inlet pipe connected from '''mixing tank''' to '''digester tank''' should be 6 inches diameter and approximately 5 feet of length. |
|- | |- | ||
| 03:30 | | 03:30 | ||
− | | Another outlet pipe of 6 inches diameter to be connected from slurry tank to the slurry collection pit | + | | Another outlet pipe of 6 inches diameter to be connected from '''slurry tank''' to the slurry collection pit. |
|- | |- | ||
| 03:39 | | 03:39 | ||
− | | If the outlet pipe is not required alternately, construct a drain between slurry tank and the slurry collection pit as shown | + | | If the outlet pipe is not required alternately, construct a drain between slurry tank and the slurry collection pit as shown. |
|- | |- | ||
| 03:52 | | 03:52 | ||
− | | The depth of this slurry collection pit can be between 4 to 6 feet | + | | The depth of this slurry collection pit can be between 4 to 6 feet. |
|- | |- | ||
| 04:00 | | 04:00 | ||
− | | The slurry collected in this pit can be manually poured in the fields | + | | The slurry collected in this pit can be manually poured in the fields. |
|- | |- | ||
| 04:06 | | 04:06 | ||
− | | We also | + | | We also require a safety-valve of 1 inch. |
|- | |- | ||
Line 177: | Line 180: | ||
|- | |- | ||
| 04:27 | | 04:27 | ||
− | | 2 Vohj clips are | + | | 2 Vohj clips are required to secure the pipe. |
|- | |- | ||
| 04:32 | | 04:32 | ||
− | | A few other items like | + | | A few other items like synthetic resin adhesive 250 ml and teflon tape. |
|- | |- | ||
Line 189: | Line 192: | ||
|- | |- | ||
| 04:48 | | 04:48 | ||
− | | These are really important for the durability of the | + | | These are really important for the durability of the biogas plant. |
− | + | ||
|- | |- | ||
| 04:54 | | 04:54 | ||
− | | Let’s now talk about the- | + | | Let’s now talk about the- area, site, No. of days required for construction and best time to construct the plant. |
|- | |- | ||
| 05:06 | | 05:06 | ||
− | | To construct the | + | | To construct the biogas plant, we need approximately 12 feet X 8 feet of land, near the house. |
|- | |- | ||
| 05:16 | | 05:16 | ||
− | | The site should be such that construction cost is minimized and it receives ample sunlight to maintain the right temperature inside the | + | | The site should be such that construction cost is minimized and it receives ample sunlight to maintain the right temperature inside the biogas plant. |
|- | |- | ||
| 05:31 | | 05:31 | ||
− | | The selected site should also ensure easy operation and maintenance of | + | | The selected site should also ensure easy operation and maintenance of '''mixing tank, digester tank, main gas control valve''' to switch off gas inflow and the slurry tank. |
|- | |- | ||
Line 217: | Line 220: | ||
|- | |- | ||
| 06:06 | | 06:06 | ||
− | | The total no. of days required to complete the civil work of a | + | | The total no. of days required to complete the civil work of a biogas plant are 3 to 5 days. |
|- | |- | ||
| 06:17 | | 06:17 | ||
− | | The best time of the year to construct the | + | | The best time of the year to construct the biogas plant is between November and June. |
|- | |- | ||
| 06:27 | | 06:27 | ||
− | | Constructing | + | | Constructing biogas plants during the rainy season is best avoided, as it becomes messy. |
|- | |- | ||
| 06:36 | | 06:36 | ||
− | | This brings us to the end of this tutorial on the material required to construct a | + | | This brings us to the end of this tutorial on the material required to construct a biogas plant. |
|- | |- | ||
| 06:45 | | 06:45 | ||
− | | The construction part of the | + | | The construction part of the biogas plant will be explained in next tutorial under the same series |
|- | |- | ||
| 06:55 | | 06:55 | ||
− | | Let’s Summarize | + | | Let’s Summarize. |
|- | |- | ||
| 06:57 | | 06:57 | ||
− | | In this tutorial, we learnt The material required to construct a | + | | In this tutorial, we learnt: * The material required to construct a biogas plant. |
|- | |- | ||
| 07:06 | | 07:06 | ||
− | | Area required to construct the plant | + | |* Area required to construct the plant |
|- | |- | ||
| 07:09 | | 07:09 | ||
− | | Preferred site and | + | |* Preferred site and |
|- | |- | ||
| 07:12 | | 07:12 | ||
− | | No. of days required along with the best time to construct the plant | + | |* No. of days required along with the best time to construct the plant. |
|- | |- | ||
| 07:19 | | 07:19 | ||
− | | This video was created by Spoken Tutorial Project with inputs from Rural-ICT team, IIT Bombay. | + | | This video was created by '''Spoken Tutorial Project''' with inputs from '''Rural-ICT team, IIT Bombay'''. |
|- | |- | ||
Line 265: | Line 268: | ||
|- | |- | ||
| 07:36 | | 07:36 | ||
− | | This is Bella Tony along with the animation team of the Spoken Tutorial project signing off. | + | | This is Bella Tony along with the animation team of the Spoken Tutorial project, signing off. |
Thank you for joining. | Thank you for joining. | ||
|} | |} |
Revision as of 15:30, 28 November 2016
Time | Narration |
00:00 | Hello. Welcome to this spoken tutorial on Material required to construct a biogas plant. |
00:09 | In this tutorial, we will learn about:
|
00:18 | * Area required to construct the plant |
00:22 | * The site
|
00:32 | Let us begin. The materials required to construct a biogas plant can be procured from any hardware & cement shop. |
00:44 | The following materials are required to construct the plant: |
00:49 | Cement 14 packs, |
00:51 | Gravel – half brass, |
00:55 | Sand - 1 brass, |
00:57 | 3 bundles of chicken mesh- 30 feet each, |
01:02 | Weldmesh sheet of size 3 feet x 4 feet with 1 inch x 1 inch of the hole size, |
01:11 | 12 feet of 6 mm steel rods, 35kgs |
01:18 | 1 kg of steel wire to be cut into 7-8 inches per piece |
01:27 | Bricks 3, 2kg of white cement, |
01:31 | 1 kg of lime powder, |
01:34 | Jute gunny bags- 25 approximately, |
01:38 | Plastic sheet- 13 feet x 10 feet and |
01:43 | 7 Bamboo sticks of approximate size - 3.5 feet |
01:49 | Liquid waterproofing material - 1 Litre |
01:53 | Wooden square trowel with a concave bent from inside. |
01:58 | These are especially used for smoothening the cement plaster on the dome of the Biogas plant. |
02:06 | Metal square trowel, |
02:08 | Shovel, |
02:09 | Small trowel, Hook |
02:12 | trough with a capacity of 10 kgs. |
02:16 | Scissor to cut the chicken mesh, |
02:18 | One Measuring tape, |
02:20 | 1kg of Newspaper, |
02:23 | scale with two hooves at the two ends and |
02:28 | an iron rod with hollow ends at either sides. |
02:33 | We will now look at other items required to build the plant such as tubes, pipes and valves. |
02:45 | We require main gas control valve of size 1 inch, metal pipe to be connected from the center of the dome, 30 cms x 1 inch of diameter. |
03:01 | This will be the main gas pipe. |
03:04 | Gas conveyor pipe of 1/2 inch diameter: |
03:08 | The length of this pipe will depend upon the distance between biogas plant and the kitchen. |
03:17 | Inlet pipe connected from mixing tank to digester tank should be 6 inches diameter and approximately 5 feet of length. |
03:30 | Another outlet pipe of 6 inches diameter to be connected from slurry tank to the slurry collection pit. |
03:39 | If the outlet pipe is not required alternately, construct a drain between slurry tank and the slurry collection pit as shown. |
03:52 | The depth of this slurry collection pit can be between 4 to 6 feet. |
04:00 | The slurry collected in this pit can be manually poured in the fields. |
04:06 | We also require a safety-valve of 1 inch. |
04:11 | Approximately, 6 metres of rubber hose pipe of ½ inch diameter. |
04:19 | This rubber hose pipe will be used to convey the gas from the safety valve to the kitchen stove. |
04:27 | 2 Vohj clips are required to secure the pipe. |
04:32 | A few other items like synthetic resin adhesive 250 ml and teflon tape. |
04:42 | Always use good quality cement, gravel and sand. |
04:48 | These are really important for the durability of the biogas plant. |
04:54 | Let’s now talk about the- area, site, No. of days required for construction and best time to construct the plant. |
05:06 | To construct the biogas plant, we need approximately 12 feet X 8 feet of land, near the house. |
05:16 | The site should be such that construction cost is minimized and it receives ample sunlight to maintain the right temperature inside the biogas plant. |
05:31 | The selected site should also ensure easy operation and maintenance of mixing tank, digester tank, main gas control valve to switch off gas inflow and the slurry tank. |
05:49 | The site should also be located near to the source of animal dung and the toilet. |
05:57 | This will help to easily operate the plant and avoid wastage of raw materials. |
06:06 | The total no. of days required to complete the civil work of a biogas plant are 3 to 5 days. |
06:17 | The best time of the year to construct the biogas plant is between November and June. |
06:27 | Constructing biogas plants during the rainy season is best avoided, as it becomes messy. |
06:36 | This brings us to the end of this tutorial on the material required to construct a biogas plant. |
06:45 | The construction part of the biogas plant will be explained in next tutorial under the same series |
06:55 | Let’s Summarize. |
06:57 | In this tutorial, we learnt: * The material required to construct a biogas plant. |
07:06 | * Area required to construct the plant |
07:09 | * Preferred site and |
07:12 | * No. of days required along with the best time to construct the plant. |
07:19 | This video was created by Spoken Tutorial Project with inputs from Rural-ICT team, IIT Bombay. |
07:29 | More information on these projects can be found at these links. |
07:36 | This is Bella Tony along with the animation team of the Spoken Tutorial project, signing off.
Thank you for joining. |