− | | style="border:0.75pt solid #000000;padding | + | | style="border:0.75pt solid #000000;padding:0.176cm;"| Visual Cue |
− | | style="border:0.75pt solid #000000;padding | + | | style="border:0.75pt solid #000000;padding:0.176cm;"| Narration |
+ | |||
|- | |- | ||
| style="border:0.75pt solid #000000;padding:0.176cm;"| Slide 1 | | style="border:0.75pt solid #000000;padding:0.176cm;"| Slide 1 | ||
Line 31: | Line 33: | ||
* the '''Biogas plant''' and | * the '''Biogas plant''' and | ||
* the '''Biogas''' burner | * the '''Biogas''' burner | ||
− | |||
− | |||
|- | |- | ||
| style="border:0.75pt solid #000000;padding:0.176cm;"| Slide 3 | | style="border:0.75pt solid #000000;padding:0.176cm;"| Slide 3 | ||
| style="border:0.75pt solid #000000;padding:0.176cm;"| Periodic partial and complete cleaning of the '''Biogas plant''' is a must. | | style="border:0.75pt solid #000000;padding:0.176cm;"| Periodic partial and complete cleaning of the '''Biogas plant''' is a must. | ||
− | |||
Line 60: | Line 59: | ||
|- | |- | ||
| style="border-top:0.75pt solid #000000;border-bottom:0.75pt solid #000000;border-left:0.75pt solid #000000;border-right:0.75pt solid #666666;padding:0.176cm;"| Slide 6 | | style="border-top:0.75pt solid #000000;border-bottom:0.75pt solid #000000;border-left:0.75pt solid #000000;border-right:0.75pt solid #666666;padding:0.176cm;"| Slide 6 | ||
− | |||
* Always, mix the bio-waste with water in the proper ratio. | * Always, mix the bio-waste with water in the proper ratio. | ||
* This will ensure-<br/> smooth flow of the bio-waste from the mixing tank into the digester tank. | * This will ensure-<br/> smooth flow of the bio-waste from the mixing tank into the digester tank. | ||
− | |||
| style="border:0.75pt solid #666666;padding-top:0cm;padding-bottom:0cm;padding-left:0.212cm;padding-right:0.212cm;"| Maintenance should be carried out on a daily basis by doing the following- | | style="border:0.75pt solid #666666;padding-top:0cm;padding-bottom:0cm;padding-left:0.212cm;padding-right:0.212cm;"| Maintenance should be carried out on a daily basis by doing the following- | ||
Line 75: | Line 72: | ||
* smooth flow of the bio-waste from the mixing tank into the digester tank. | * smooth flow of the bio-waste from the mixing tank into the digester tank. | ||
− | |||
− | |||
|- | |- | ||
Line 85: | Line 80: | ||
* Sticks and branches of trees should also be avoided. | * Sticks and branches of trees should also be avoided. | ||
− | |||
− | |||
|- | |- | ||
Line 95: | Line 88: | ||
* As they will accumulate at the base of the digester and hinder gas production. | * As they will accumulate at the base of the digester and hinder gas production. | ||
− | |||
− | |||
|- | |- | ||
Line 110: | Line 101: | ||
* Hence, bio-waste will come out in the slurry tank without being digested. | * Hence, bio-waste will come out in the slurry tank without being digested. | ||
− | |||
− | |||
|- | |- | ||
Line 119: | Line 108: | ||
* Water condensation should be checked regularly. | * Water condensation should be checked regularly. | ||
* As water in the pipeline will block the passage of gas. | * As water in the pipeline will block the passage of gas. | ||
− | |||
Line 129: | Line 117: | ||
* Ensure that the slurry is being emptied out of the slurry tank when it is full. | * Ensure that the slurry is being emptied out of the slurry tank when it is full. | ||
− | |||
− | |||
|- | |- |
Revision as of 15:12, 20 May 2016
Visual Cue | Narration |
Slide 1
|
Hello and Welcome to the Spoken Tutorial on Maintenance and Repair of the Biogas plant. |
Slide 2
Learning Objective
|
In this tutorial we will learn:
|
Slide 3 | Periodic partial and complete cleaning of the Biogas plant is a must.
|
Slide 4
Maintenance section |
Let us first look into the maintenance section. |
Slide 5
|
So, how often should one carry out maintenance of the Biogas plant? |
Slide 6
|
Maintenance should be carried out on a daily basis by doing the following-
|
Slide 7 | * If adding plant waste, crush and chop the leaves up to 1-4 cms.
|
Slide 8 | * Soap, oil, chemical, insecticide and pesticides should not be added.
|
Slide 9 | * Quantity of bio-waste to be supplied depends upon the size of the plant.
|
Slide 10 | * If less bio-waste is fed into the digester, then gas production will be low.
|
Slide 11 | * Do so by lifting the gas pipe so that the water can run back into the digester tank.
|
* No inflammable items like-
lighter and/or cigarettes should be brought near the outlet pipe of the dome. | |
Slide 12 | Another important thing to be done is that-
This is usually done by the mason himself. |
[[Image:]] | As shown, keep the mixing tank and the slurry tank covered.
|
Slide 13
Repair section Image of a technician |
Let us now look into the Repair section.
|
[[Image:]]
|
What you see here is a Biogas burner with the flame. |
[[Image:]]
[[Image:]] [[Image:]][[Image:]] |
To start repairing, first switch off the inflow of gas by turning off the knobs on-
Doing so is very important.
|
[[Image:]] | What you see here is the burner without the flame after the knobs have been turned off.
|
[[Image:]]
|
Now remove the hose pipe connected to the burner.
|
[[Image:]] | Now place the hose pipe near your ear to check for the sound of gas.
|
[[Image:]]
[[Image:]]
|
Now we start dismantling the burner.
|
[[Image:]] | Next we will remove the debris in the burner.
|
[[Image:]] | Slightly tap the burner and then turn it upside down.
|
[[Image:]] | In case of hard debris which cannot be removed by blowing air, a dry scrubbing pad can be used. |
[[Image:]] | To clean the flame ring, use a pin and insert it into the holes for cleaning.
|
[[Image:]] | A clean ring will look like this.
|
Slide 14
|
Apart from what is mentioned, periodic inspection of the plant is necessary.
|
Slide 15 | Once in 3 years,
|
Slide 16 | To make this mixture use the following-
Mix these thoroughly. And use. |
Slide 17
Summary |
Let us summarize:
|
Slide 3
Acknowledgements This video was created by: Spoken Tutorial Project with inputs from Rural-ICT team, IIT Bombay. |
This video was created by-
Spoken Tutorial Project with inputs from Rural-ICT team, IIT Bombay. |
More information on these projects can be found at these links | More information on these projects can be found at these links. |
Pictures and technology support: Courtesy: Bhagirath Rural Development Foundation Village- Zarap, Taluka- Kudal, Dist.- Sindhudurg |
Pictures and technology support: Courtesy: Bhagirath Rural Development Foundation Village- Zarap, Taluka- Kudal, Dist.- Sindhudurg |
This is Bella Tony along with the animation team of the Spoken Tutorial project signing off.
Thank you for joining. |