| Hello. Welcome to this spoken tutorial on Material required to construct a '''biogas plant'''  
+
| Hello. Welcome to this '''spoken tutorial''' on '''Material required to construct a biogas plant'''.
  
 
|-  
 
|-  
 
|  00:09
 
|  00:09
| In this tutorial, we will learn about the various materials required to construct a '''biogas plant'''  
+
| In this tutorial, we will learn about:
 +
* the various materials required to construct a '''biogas plant'''  
  
 
|-  
 
|-  
 
|  00:18
 
|  00:18
| Area required to construct the plant
+
|* Area required to construct the '''plant'''
  
 
|-  
 
|-  
 
| 00:22
 
| 00:22
|The Site, No. of days required for construction and the best time to construct the plant  
+
|* The site
 +
* No. of days required for construction and *
 +
* the best time to construct the plant.
  
 
|-  
 
|-  
 
| 00:32
 
| 00:32
| Let us begin. The materials required to construct a '''biogas plant''' can be procured from any hardware & cement shop.  
+
| Let us begin. The materials required to construct a biogas plant can be procured from any hardware & cement shop.  
  
 
|-  
 
|-  
Line 29: Line 32:
 
|-  
 
|-  
 
|00:49
 
|00:49
| Cement 14 packs  
+
| Cement 14 packs,
  
 
|-  
 
|-  
 
|00:51
 
|00:51
| Gravel – half brass  
+
| Gravel – half brass,
  
 
|-  
 
|-  
 
| 00:55
 
| 00:55
| Sand - 1 brass  
+
| Sand - 1 brass,
  
 
|-  
 
|-  
 
| 00:57
 
| 00:57
| 3 bundles of chicken mesh, 30 feet each  
+
| 3 bundles of chicken mesh- 30 feet each,
  
 
|-  
 
|-  
 
| 01:02
 
| 01:02
| Weldmesh sheet of size 3 feet x 4 feet with 1 inch x 1 inch of the hole size  
+
| Weldmesh sheet of size 3 feet x 4 feet with 1 inch x 1 inch of the hole size,
  
 
|-  
 
|-  
Line 53: Line 56:
 
|-  
 
|-  
 
| 01:18
 
| 01:18
| 1 kg of steel wire to be cut into 7-8 inches per piece
+
| 1 kg of steel wire to be cut into 7-8 inches per piece
  
 
|-  
 
|-  
 
| 01:27
 
| 01:27
| Bricks 3, 2kg of white cement  
+
| Bricks 3, 2kg of white cement,
  
 
|-  
 
|-  
 
|01:31
 
|01:31
| 1 kg of lime powder  
+
| 1 kg of lime powder,
  
 
|-  
 
|-  
 
| 01:34
 
| 01:34
| Jute gunny bags 25 Approximately
+
| Jute gunny bags- 25 approximately,
  
 
|-  
 
|-  
Line 81: Line 84:
 
|-  
 
|-  
 
| 01:53
 
| 01:53
| Wooden square trowel with a concave bent from inside  
+
| Wooden square trowel with a concave bent from inside.
  
 
|-  
 
|-  
 
| 01:58
 
| 01:58
| These are especially used for smoothening the cement plaster on the dome of the Biogas plant  
+
| These are especially used for smoothening the cement plaster on the dome of the Biogas plant.
  
 
|-  
 
|-  
 
| 02:06
 
| 02:06
| Metal square trowel  
+
| Metal square trowel,
  
 
|-  
 
|-  
 
| 02:08
 
| 02:08
| Shovel  
+
| Shovel,
  
 
|-  
 
|-  
Line 101: Line 104:
 
|-  
 
|-  
 
| 02:12
 
| 02:12
| Trough with a capacity of 10 kgs  
+
| trough with a capacity of 10 kgs.
  
 
|-  
 
|-  
 
| 02:16
 
| 02:16
| Scissor to cut the chicken mesh  
+
| Scissor to cut the chicken mesh,
  
 
|-  
 
|-  
 
| 02:18
 
| 02:18
| One Measuring tape  
+
| One Measuring tape,
  
 
|-  
 
|-  
 
| 02:20
 
| 02:20
| 1kg of Newspaper  
+
| 1kg of Newspaper,
  
 
|-  
 
|-  
 
| 02:23
 
| 02:23
| Scale with two hooves at the two ends and
+
| scale with two hooves at the two ends and
  
 
|-  
 
|-  
 
| 02:28
 
| 02:28
| An Iron rod with hollow ends at the either sides  
+
| an iron rod with hollow ends at either sides.
  
 
|-  
 
|-  
 
| 02:33
 
| 02:33
| We will now look at other items required to built the plant such as tubes, pipes and valves  
+
| We will now look at other items required to build the plant such as tubes, pipes and valves.
  
 
|-  
 
|-  
 
| 02:45
 
| 02:45
| We required main gas control valve of size 1 inch, metal pipe to be connected from the center of the dome, 30 cms x 1 inch of diameter  
+
| We require main gas control valve of size 1 inch, metal pipe to be connected from the center of the dome, 30 cms x 1 inch of diameter.
  
 
|-  
 
|-  
 
| 03:01
 
| 03:01
|  This will be the main gas pipe  
+
|  This will be the main gas pipe.
  
 
|-  
 
|-  
 
| 03:04
 
| 03:04
| Gas conveyer pipe of 1/2 inch diameter  
+
| Gas conveyor pipe of 1/2 inch diameter:
  
 
|-  
 
|-  
 
| 03:08
 
| 03:08
| The length of this pipe will depend upon the distance between '''Biogas plant '''and the kitchen  
+
| The length of this pipe will depend upon the distance between biogas plant and the kitchen.
  
 
|-  
 
|-  
 
| 03:17
 
| 03:17
|Inlet pipe connected from '''Mixing tank''' to '''Digester tank ''' should be 6 inches diameter and approximately 5 feet of length  
+
|Inlet pipe connected from '''mixing tank''' to '''digester tank''' should be 6 inches diameter and approximately 5 feet of length.
  
 
|-  
 
|-  
 
| 03:30
 
| 03:30
| Another outlet pipe of 6 inches diameter to be connected from slurry tank to the slurry collection pit  
+
| Another outlet pipe of 6 inches diameter to be connected from '''slurry tank''' to the slurry collection pit.
  
 
|-  
 
|-  
 
| 03:39
 
| 03:39
| If the outlet pipe is not required  alternately, construct a drain between slurry tank and the slurry collection pit as shown   
+
| If the outlet pipe is not required  alternately, construct a drain between slurry tank and the slurry collection pit as shown.  
  
 
|-  
 
|-  
 
| 03:52
 
| 03:52
| The depth of this slurry collection pit can be between 4 to 6 feet  
+
| The depth of this slurry collection pit can be between 4 to 6 feet.
  
 
|-  
 
|-  
 
| 04:00
 
| 04:00
|  The slurry collected in this pit can be manually poured in the fields  
+
|  The slurry collected in this pit can be manually poured in the fields.
  
 
|-  
 
|-  
 
| 04:06
 
| 04:06
| We also required a safety-valve of 1 inch
+
| We also require a safety-valve of 1 inch.
  
 
|-  
 
|-  
Line 177: Line 180:
 
|-  
 
|-  
 
| 04:27
 
| 04:27
| 2 Vohj clips are require to secure the pipe.  
+
| 2 Vohj clips are required to secure the pipe.  
  
 
|-  
 
|-  
 
| 04:32
 
| 04:32
| A few other items like  Synthetic Resin Adhesive  250 ml and Teflon tape  
+
| A few other items like  synthetic resin adhesive 250 ml and teflon tape.
  
 
|-  
 
|-  
Line 189: Line 192:
 
|-  
 
|-  
 
| 04:48
 
| 04:48
| These are really important for the durability of the '''biogas plant.'''
+
| These are really important for the durability of the biogas plant.
 
+
 
|-  
 
|-  
 
| 04:54
 
| 04:54
| Let’s now talk about the- Area, Site, No. of days required for construction and best time to construct the plant  
+
| Let’s now talk about the- area, site, No. of days required for construction and best time to construct the plant.
  
 
|-  
 
|-  
 
| 05:06
 
| 05:06
| To construct the '''biogas plant''', we need approximately 12feet X 8 feet of land, near the house.  
+
| To construct the biogas plant, we need approximately 12 feet X 8 feet of land, near the house.  
  
 
|-  
 
|-  
 
| 05:16
 
| 05:16
| The site should be such that  construction cost is minimized and  it receives ample sunlight to maintain the right temperature inside the '''biogas plant'''.  
+
| The site should be such that  construction cost is minimized and  it receives ample sunlight to maintain the right temperature inside the biogas plant.  
  
 
|-  
 
|-  
 
| 05:31
 
| 05:31
| The selected site should also ensure easy operation and maintenance of  Mixing tank, Digester tank, Main gas control valve to switch off gas inflow and the Slurry tank  
+
| The selected site should also ensure easy operation and maintenance of  '''mixing tank, digester tank, main gas control valve''' to switch off gas inflow and the slurry tank.
  
 
|-  
 
|-  
Line 217: Line 220:
 
|-  
 
|-  
 
| 06:06
 
| 06:06
| The total no. of days required to complete the civil work of a '''biogas plant '''are 3 to 5 days.  
+
| The total no. of days required to complete the civil work of a biogas plant are 3 to 5 days.  
  
 
|-  
 
|-  
 
| 06:17
 
| 06:17
| The best time of the year to construct the '''biogas plant '''is between November and June.  
+
| The best time of the year to construct the biogas plant is between November and June.  
  
 
|-  
 
|-  
 
| 06:27
 
| 06:27
| Constructing '''biogas plants''' during the rainy season is best avoided, as it becomes messy.  
+
| Constructing biogas plants during the rainy season is best avoided, as it becomes messy.  
  
 
|-  
 
|-  
 
| 06:36
 
| 06:36
| This brings us to the end of this tutorial on the material required to construct a Biogas plant.  
+
| This brings us to the end of this tutorial on the material required to construct a biogas plant.  
  
 
|-  
 
|-  
 
| 06:45
 
| 06:45
| The construction part of the Biogas plant will be explained in next tutorial under the same series  
+
| The construction part of the biogas plant will be explained in next tutorial under the same series  
  
 
|-  
 
|-  
 
| 06:55
 
| 06:55
| Let’s Summarize
+
| Let’s Summarize.
  
 
|-  
 
|-  
 
| 06:57
 
| 06:57
| In this tutorial, we learnt The material required to construct a '''biogas plant'''
+
| In this tutorial, we learnt: * The material required to construct a biogas plant.
  
 
|-  
 
|-  
 
| 07:06
 
| 07:06
| Area required to construct the plant  
+
|* Area required to construct the plant  
  
 
|-  
 
|-  
 
| 07:09
 
| 07:09
| Preferred site and  
+
|* Preferred site and  
  
 
|-  
 
|-  
 
| 07:12
 
| 07:12
| No. of days required along with the  best time to construct the plant  
+
|* No. of days required along with the  best time to construct the plant.
  
 
|-  
 
|-  
 
| 07:19
 
| 07:19
| This video was created by Spoken Tutorial Project with inputs from Rural-ICT team, IIT Bombay.  
+
| This video was created by '''Spoken Tutorial Project''' with inputs from '''Rural-ICT team, IIT Bombay'''.  
  
 
|-  
 
|-  
Line 265: Line 268:
 
|-  
 
|-  
 
| 07:36
 
| 07:36
|  This is Bella Tony along with the animation team of the Spoken Tutorial project  signing off.  
+
|  This is Bella Tony along with the animation team of the Spoken Tutorial project, signing off.  
 
Thank you for joining.  
 
Thank you for joining.  
  
 
|}
 
|}

Revision as of 15:30, 28 November 2016

Time Narration
00:00 Hello. Welcome to this spoken tutorial on Material required to construct a biogas plant.
00:09 In this tutorial, we will learn about:
  • the various materials required to construct a biogas plant
00:18 * Area required to construct the plant
00:22 * The site
  • No. of days required for construction and *
  • the best time to construct the plant.
00:32 Let us begin. The materials required to construct a biogas plant can be procured from any hardware & cement shop.
00:44 The following materials are required to construct the plant:
00:49 Cement 14 packs,
00:51 Gravel – half brass,
00:55 Sand - 1 brass,
00:57 3 bundles of chicken mesh- 30 feet each,
01:02 Weldmesh sheet of size 3 feet x 4 feet with 1 inch x 1 inch of the hole size,
01:11 12 feet of 6 mm steel rods, 35kgs
01:18 1 kg of steel wire to be cut into 7-8 inches per piece
01:27 Bricks 3, 2kg of white cement,
01:31 1 kg of lime powder,
01:34 Jute gunny bags- 25 approximately,
01:38 Plastic sheet- 13 feet x 10 feet and
01:43 7 Bamboo sticks of approximate size - 3.5 feet
01:49 Liquid waterproofing material - 1 Litre
01:53 Wooden square trowel with a concave bent from inside.
01:58 These are especially used for smoothening the cement plaster on the dome of the Biogas plant.
02:06 Metal square trowel,
02:08 Shovel,
02:09 Small trowel, Hook
02:12 trough with a capacity of 10 kgs.
02:16 Scissor to cut the chicken mesh,
02:18 One Measuring tape,
02:20 1kg of Newspaper,
02:23 scale with two hooves at the two ends and
02:28 an iron rod with hollow ends at either sides.
02:33 We will now look at other items required to build the plant such as tubes, pipes and valves.
02:45 We require main gas control valve of size 1 inch, metal pipe to be connected from the center of the dome, 30 cms x 1 inch of diameter.
03:01 This will be the main gas pipe.
03:04 Gas conveyor pipe of 1/2 inch diameter:
03:08 The length of this pipe will depend upon the distance between biogas plant and the kitchen.
03:17 Inlet pipe connected from mixing tank to digester tank should be 6 inches diameter and approximately 5 feet of length.
03:30 Another outlet pipe of 6 inches diameter to be connected from slurry tank to the slurry collection pit.
03:39 If the outlet pipe is not required alternately, construct a drain between slurry tank and the slurry collection pit as shown.
03:52 The depth of this slurry collection pit can be between 4 to 6 feet.
04:00 The slurry collected in this pit can be manually poured in the fields.
04:06 We also require a safety-valve of 1 inch.
04:11 Approximately, 6 metres of rubber hose pipe of ½ inch diameter.
04:19 This rubber hose pipe will be used to convey the gas from the safety valve to the kitchen stove.
04:27 2 Vohj clips are required to secure the pipe.
04:32 A few other items like synthetic resin adhesive 250 ml and teflon tape.
04:42 Always use good quality cement, gravel and sand.
04:48 These are really important for the durability of the biogas plant.
04:54 Let’s now talk about the- area, site, No. of days required for construction and best time to construct the plant.
05:06 To construct the biogas plant, we need approximately 12 feet X 8 feet of land, near the house.
05:16 The site should be such that construction cost is minimized and it receives ample sunlight to maintain the right temperature inside the biogas plant.
05:31 The selected site should also ensure easy operation and maintenance of mixing tank, digester tank, main gas control valve to switch off gas inflow and the slurry tank.
05:49 The site should also be located near to the source of animal dung and the toilet.
05:57 This will help to easily operate the plant and avoid wastage of raw materials.
06:06 The total no. of days required to complete the civil work of a biogas plant are 3 to 5 days.
06:17 The best time of the year to construct the biogas plant is between November and June.
06:27 Constructing biogas plants during the rainy season is best avoided, as it becomes messy.
06:36 This brings us to the end of this tutorial on the material required to construct a biogas plant.
06:45 The construction part of the biogas plant will be explained in next tutorial under the same series
06:55 Let’s Summarize.
06:57 In this tutorial, we learnt: * The material required to construct a biogas plant.
07:06 * Area required to construct the plant
07:09 * Preferred site and
07:12 * No. of days required along with the best time to construct the plant.
07:19 This video was created by Spoken Tutorial Project with inputs from Rural-ICT team, IIT Bombay.
07:29 More information on these projects can be found at these links.
07:36 This is Bella Tony along with the animation team of the Spoken Tutorial project, signing off.

Thank you for joining.