Difference between revisions of "LibreOffice-Calc-on-BOSS-Linux/C3/Linking-Calc-Data/English-timed"
From Script | Spoken-Tutorial
PoojaMoolya (Talk | contribs) (Created page with " {| border=1 || '''Time''' || '''Narration''' |- ||00:00 ||Welcome to the Spoken tutorial on Linking in Calc in LibreOffice Calc. |- ||00:06 ||In this tutorial we will lear...") |
PoojaMoolya (Talk | contribs) |
||
Line 1: | Line 1: | ||
+ | '''Resources for recording''' | ||
+ | [[Media:LinkinginCalc.zip |Linking in Calc]] | ||
+ | |||
+ | |||
+ | |||
{| border=1 | {| border=1 | ||
Line 17: | Line 22: | ||
|- | |- | ||
− | ||00: | + | ||00:13 |
||How to use hyperlinks in Calc. | ||How to use hyperlinks in Calc. | ||
|- | |- | ||
− | ||00: | + | ||00:17 |
− | ||Here we are using | + | ||Here we are using Ubuntu Linux version 10.04 as our operating system and LibreOffice Suite version 3.3.4. |
|- | |- | ||
− | ||00: | + | ||00:29 |
||LibreOffice Calc allows you to reference | ||LibreOffice Calc allows you to reference | ||
|- | |- | ||
− | ||00: | + | ||00:033 |
||A cell from another sheet to a cell in the current sheet | ||A cell from another sheet to a cell in the current sheet | ||
|- | |- | ||
− | ||00: | + | ||00:37 |
− | ||A cell from another spread sheet | + | ||A cell from another spread sheet |
+ | If you have saved both the spreadsheets. | ||
|- | |- | ||
− | ||00: | + | ||00:44 |
||Let’s open “Personal-Finance-Tracker.ods”. | ||Let’s open “Personal-Finance-Tracker.ods”. | ||
|- | |- | ||
− | ||00: | + | ||00:49 |
||The sheet 1 of our file contains the spreadsheet for “Personal Finance Tracker”. | ||The sheet 1 of our file contains the spreadsheet for “Personal Finance Tracker”. | ||
|- | |- | ||
− | ||00: | + | ||00:55 |
||I have added some amounts in the columns “Spent” and “Received”. | ||I have added some amounts in the columns “Spent” and “Received”. | ||
|- | |- | ||
− | ||01: | + | ||01:04 |
||Now, let us find the sum total of the components under “Cost” and | ||Now, let us find the sum total of the components under “Cost” and | ||
Line 55: | Line 61: | ||
|- | |- | ||
− | ||01: | + | ||01:11 |
||Click on the cell referenced as C9 and enter the formula “is equal to SUM” and within braces “C3 colon C7”. | ||Click on the cell referenced as C9 and enter the formula “is equal to SUM” and within braces “C3 colon C7”. | ||
|- | |- | ||
− | ||01: | + | ||01:24 |
||Then press the “Enter” key. | ||Then press the “Enter” key. | ||
|- | |- | ||
− | ||01: | + | ||01:27 |
||Click on the cell referenced as D9 and using the same formula find the total. | ||Click on the cell referenced as D9 and using the same formula find the total. | ||
|- | |- | ||
− | ||01: | + | ||01:36 |
||Now, we will display the total balance under “Cost” and “Spent” on a different sheet using cell referencing. | ||Now, we will display the total balance under “Cost” and “Spent” on a different sheet using cell referencing. | ||
|- | |- | ||
− | ||01: | + | ||01:45 |
||Let’s click on the “Sheet 2” tab. | ||Let’s click on the “Sheet 2” tab. | ||
|- | |- | ||
− | ||01: | + | ||01:48 |
||This opens the new sheet. | ||This opens the new sheet. | ||
|- | |- | ||
− | ||01: | + | ||01:51 |
||Now click on the cell referenced as A1 and type the heading “COMPONENT” inside it. | ||Now click on the cell referenced as A1 and type the heading “COMPONENT” inside it. | ||
|- | |- | ||
− | || | + | ||02:00 |
||Click on the cell referenced as B1 and type the heading “BALANCE” inside it. | ||Click on the cell referenced as B1 and type the heading “BALANCE” inside it. | ||
|- | |- | ||
− | ||02: | + | ||02:07 |
||Now, let’s enter the names of the components under the heading. | ||Now, let’s enter the names of the components under the heading. | ||
|- | |- | ||
− | ||02: | + | ||02:12 |
||Click on the cell referenced as A3 and type“COST” . | ||Click on the cell referenced as A3 and type“COST” . | ||
Line 97: | Line 103: | ||
|- | |- | ||
− | ||02: | + | ||02:19 |
||Below “COST”, let’s enter the next component as “SPENT” in the cell referenced A4. | ||Below “COST”, let’s enter the next component as “SPENT” in the cell referenced A4. | ||
|- | |- | ||
− | ||02: | + | ||02:27 |
||Now, click on the empty cell B3. | ||Now, click on the empty cell B3. | ||
|- | |- | ||
− | ||02: | + | ||02:31 |
||The cells B3 and B4 will have the total balance under the heading “COST” and “SPENT”, | ||The cells B3 and B4 will have the total balance under the heading “COST” and “SPENT”, | ||
|- | |- | ||
− | ||02: | + | ||02:38 |
||which we calculated in “Sheet 1”. | ||which we calculated in “Sheet 1”. | ||
|- | |- | ||
− | ||02: | + | ||02:41 |
||This will be done by referencing. | ||This will be done by referencing. | ||
|- | |- | ||
− | ||02: | + | ||02:44 |
||To make the cell reference in cell B3, click on the “equal to” sign next to the “Input line”. | ||To make the cell reference in cell B3, click on the “equal to” sign next to the “Input line”. | ||
|- | |- | ||
− | ||02: | + | ||02:53 |
||Now, on the Sheet tab click on “Sheet 1”. | ||Now, on the Sheet tab click on “Sheet 1”. | ||
|- | |- | ||
− | ||02: | + | ||02:59 |
||In this sheet, we will click on the cell C9 which contains the total under the column “Cost”. | ||In this sheet, we will click on the cell C9 which contains the total under the column “Cost”. | ||
|- | |- | ||
− | ||03: | + | ||03:07 |
||Notice, that in the “Input line” the statement “Sheet 1 dot C9”, is displayed. | ||Notice, that in the “Input line” the statement “Sheet 1 dot C9”, is displayed. | ||
|- | |- | ||
− | ||03: | + | ||03:15 |
||Now click on the check mark next to the “Input line”. | ||Now click on the check mark next to the “Input line”. | ||
|- | |- | ||
− | ||03: | + | ||03:20 |
||Notice, that the grand total of the data under “Cost” in the “Sheet 1” tab is automatically entered into the cell referenced as B3 in the “Sheet 2 “ tab. | ||Notice, that the grand total of the data under “Cost” in the “Sheet 1” tab is automatically entered into the cell referenced as B3 in the “Sheet 2 “ tab. | ||
|- | |- | ||
− | ||03: | + | ||03:34 |
||Similarly,we can enter the grand totals of other components through referencing. | ||Similarly,we can enter the grand totals of other components through referencing. | ||
|- | |- | ||
− | ||03: | + | ||03:41 |
||Referencing can be very useful to summarise data if there are many sheets, with a lot of data content. | ||Referencing can be very useful to summarise data if there are many sheets, with a lot of data content. | ||
|- | |- | ||
− | ||03: | + | ||03:49 |
||Now, let’s learn how to create Hyperlinks in Calc sheets. | ||Now, let’s learn how to create Hyperlinks in Calc sheets. | ||
|- | |- | ||
− | ||03: | + | ||03:55 |
||You can use Hyperlinks to jump | ||You can use Hyperlinks to jump | ||
Line 163: | Line 169: | ||
|- | |- | ||
− | ||04: | + | ||04:06 |
||In “Personal-Finance-Tracker.ods” | ||In “Personal-Finance-Tracker.ods” | ||
the personal finance tracker is in “Sheet 1” and the rest of the content is in “Sheet 2”. | the personal finance tracker is in “Sheet 1” and the rest of the content is in “Sheet 2”. | ||
|- | |- | ||
− | ||04: | + | ||04:17 |
||Let’s say we want to jump from Sheet 1 to Sheet 2. | ||Let’s say we want to jump from Sheet 1 to Sheet 2. | ||
|- | |- | ||
− | ||04: | + | ||04:22 |
||First, click on the “Sheet 1” tab. | ||First, click on the “Sheet 1” tab. | ||
|- | |- | ||
− | ||04: | + | ||04:25 |
||Here let’s click on the cell referenced as B14 and enter ”Sheet 2”. | ||Here let’s click on the cell referenced as B14 and enter ”Sheet 2”. | ||
|- | |- | ||
− | ||04: | + | ||04:33 |
||You see that the name “Sheet 2” is displayed on the “Input line”. | ||You see that the name “Sheet 2” is displayed on the “Input line”. | ||
|- | |- | ||
− | ||04: | + | ||04:38 |
||Now select the text “Sheet 2” in the Input Line. | ||Now select the text “Sheet 2” in the Input Line. | ||
|- | |- | ||
− | ||04: | + | ||04:44 |
||After selecting the text, click on the “Hyperlink” icon in the toolbar. | ||After selecting the text, click on the “Hyperlink” icon in the toolbar. | ||
|- | |- | ||
− | ||04: | + | ||04:51 |
||The Hyperlink dialog box appears. | ||The Hyperlink dialog box appears. | ||
|- | |- | ||
− | ||04: | + | ||04:55 |
||On the left side, let’s select the “Document” option. | ||On the left side, let’s select the “Document” option. | ||
|- | |- | ||
− | ||04: | + | ||04:59 |
||Click on the “Target in document” icon in the dialog box. | ||Click on the “Target in document” icon in the dialog box. | ||
|- | |- | ||
− | ||05: | + | ||05:04 |
||A new “Target in document” dialog box appears. | ||A new “Target in document” dialog box appears. | ||
|- | |- | ||
− | ||05: | + | ||05:08 |
||Now, click on the “plus sign” next to the “Sheet” option. | ||Now, click on the “plus sign” next to the “Sheet” option. | ||
|- | |- | ||
− | ||05: | + | ||05:13 |
||In the dialog box which appears, click on the “Sheet 2” option. | ||In the dialog box which appears, click on the “Sheet 2” option. | ||
|- | |- | ||
− | ||05: | + | ||05:18 |
||Now click on the “Apply” button and then click on the “Close” button. | ||Now click on the “Apply” button and then click on the “Close” button. | ||
|- | |- | ||
− | ||05: | + | ||05:24 |
||Now, from the Hyperlink dialog box, click on “Apply” and then click on “Close”. | ||Now, from the Hyperlink dialog box, click on “Apply” and then click on “Close”. | ||
|- | |- | ||
− | ||05: | + | ||05:32 |
||The “Sheet 1” tab appears in front with the text “Sheet 2” highlighted in the cell. | ||The “Sheet 1” tab appears in front with the text “Sheet 2” highlighted in the cell. | ||
|- | |- | ||
− | ||05: | + | ||05:40 |
||Now, when we click on the text “Sheet 2”, it directly takes us to the sheet where we had entered the balance for Cost. | ||Now, when we click on the text “Sheet 2”, it directly takes us to the sheet where we had entered the balance for Cost. | ||
|- | |- | ||
− | ||05: | + | ||05:51 |
||We have created a hyperlink! | ||We have created a hyperlink! | ||
|- | |- | ||
− | ||05: | + | ||05:55 |
||To remove the hyperlink, first select the hyperlinked text “Sheet 2”. | ||To remove the hyperlink, first select the hyperlinked text “Sheet 2”. | ||
|- | |- | ||
− | || | + | ||06:01 |
||Now right click and from the context menu, click on the “Default Formatting” option. | ||Now right click and from the context menu, click on the “Default Formatting” option. | ||
|- | |- | ||
− | ||06: | + | ||06:09 |
||The the text is no longer hyperlinked. | ||The the text is no longer hyperlinked. | ||
|- | |- | ||
− | ||06: | + | ||06:12 |
||It is just like any normal text in the document. | ||It is just like any normal text in the document. | ||
|- | |- | ||
− | ||06: | + | ||06:16 |
||Let us undo the changes. | ||Let us undo the changes. | ||
|- | |- | ||
− | ||06: | + | ||06:20 |
||This brings us to the end of the Spoken Tutorial on LibreOffice Calc. | ||This brings us to the end of the Spoken Tutorial on LibreOffice Calc. | ||
|- | |- | ||
− | ||06: | + | ||06:25 |
||To summarize, we learned how to: | ||To summarize, we learned how to: | ||
Reference to other sheets in Calc. | Reference to other sheets in Calc. | ||
|- | |- | ||
− | ||06: | + | ||06:31 |
||Use hyperlinks in Calc. | ||Use hyperlinks in Calc. | ||
|- | |- | ||
− | ||06: | + | ||06:36 |
||Watch the video available at the following link | ||Watch the video available at the following link | ||
|- | |- | ||
− | ||06: | + | ||06:40 |
||It summarises the Spoken Tutorial project | ||It summarises the Spoken Tutorial project | ||
|- | |- | ||
− | ||06: | + | ||06:43 |
||If you do not have good bandwidth, you can download and watch it | ||If you do not have good bandwidth, you can download and watch it | ||
|- | |- | ||
− | ||06: | + | ||06:47 |
||The Spoken Tutorial Project Team | ||The Spoken Tutorial Project Team | ||
Conducts workshops using spoken tutorials. | Conducts workshops using spoken tutorials. | ||
|- | |- | ||
− | ||06: | + | ||06:52 |
||Gives certificates for those who pass an online test | ||Gives certificates for those who pass an online test | ||
|- | |- | ||
− | ||06: | + | ||06:56 |
||For more details, please write to contact at spoken hyphen tutorial dot org | ||For more details, please write to contact at spoken hyphen tutorial dot org | ||
|- | |- | ||
− | ||07: | + | ||07:03 |
||Spoken Tutorial Project is a part of the Talk to a Teacher project | ||Spoken Tutorial Project is a part of the Talk to a Teacher project | ||
|- | |- | ||
− | ||07: | + | ||07:07 |
||It is supported by the National Mission on Education through ICT, MHRD, Government of India | ||It is supported by the National Mission on Education through ICT, MHRD, Government of India | ||
|- | |- | ||
− | ||07: | + | ||07:15 |
||More information on this Mission is available at | ||More information on this Mission is available at | ||
Line 308: | Line 314: | ||
|- | |- | ||
− | ||07: | + | ||07:25 |
||This tutorial has been contributed by DesiCrew Solutions Pvt. Ltd | ||This tutorial has been contributed by DesiCrew Solutions Pvt. Ltd | ||
Thanks for joining | Thanks for joining |
Revision as of 10:34, 19 January 2015
Resources for recording Linking in Calc
Time | Narration |
00:00 | Welcome to the Spoken tutorial on Linking in Calc in LibreOffice Calc. |
00:06 | In this tutorial we will learn the following: |
00:10 | How to reference other sheets in Calc. |
00:13 | How to use hyperlinks in Calc. |
00:17 | Here we are using Ubuntu Linux version 10.04 as our operating system and LibreOffice Suite version 3.3.4. |
00:29 | LibreOffice Calc allows you to reference |
00:033 | A cell from another sheet to a cell in the current sheet |
00:37 | A cell from another spread sheet
If you have saved both the spreadsheets. |
00:44 | Let’s open “Personal-Finance-Tracker.ods”. |
00:49 | The sheet 1 of our file contains the spreadsheet for “Personal Finance Tracker”. |
00:55 | I have added some amounts in the columns “Spent” and “Received”. |
01:04 | Now, let us find the sum total of the components under “Cost” and
“Spent” respectively. |
01:11 | Click on the cell referenced as C9 and enter the formula “is equal to SUM” and within braces “C3 colon C7”. |
01:24 | Then press the “Enter” key. |
01:27 | Click on the cell referenced as D9 and using the same formula find the total. |
01:36 | Now, we will display the total balance under “Cost” and “Spent” on a different sheet using cell referencing. |
01:45 | Let’s click on the “Sheet 2” tab. |
01:48 | This opens the new sheet. |
01:51 | Now click on the cell referenced as A1 and type the heading “COMPONENT” inside it. |
02:00 | Click on the cell referenced as B1 and type the heading “BALANCE” inside it. |
02:07 | Now, let’s enter the names of the components under the heading. |
02:12 | Click on the cell referenced as A3 and type“COST” .
Press “Enter”. |
02:19 | Below “COST”, let’s enter the next component as “SPENT” in the cell referenced A4. |
02:27 | Now, click on the empty cell B3. |
02:31 | The cells B3 and B4 will have the total balance under the heading “COST” and “SPENT”, |
02:38 | which we calculated in “Sheet 1”. |
02:41 | This will be done by referencing. |
02:44 | To make the cell reference in cell B3, click on the “equal to” sign next to the “Input line”. |
02:53 | Now, on the Sheet tab click on “Sheet 1”. |
02:59 | In this sheet, we will click on the cell C9 which contains the total under the column “Cost”. |
03:07 | Notice, that in the “Input line” the statement “Sheet 1 dot C9”, is displayed. |
03:15 | Now click on the check mark next to the “Input line”. |
03:20 | Notice, that the grand total of the data under “Cost” in the “Sheet 1” tab is automatically entered into the cell referenced as B3 in the “Sheet 2 “ tab. |
03:34 | Similarly,we can enter the grand totals of other components through referencing. |
03:41 | Referencing can be very useful to summarise data if there are many sheets, with a lot of data content. |
03:49 | Now, let’s learn how to create Hyperlinks in Calc sheets. |
03:55 | You can use Hyperlinks to jump
|
04:06 | In “Personal-Finance-Tracker.ods”
the personal finance tracker is in “Sheet 1” and the rest of the content is in “Sheet 2”. |
04:17 | Let’s say we want to jump from Sheet 1 to Sheet 2. |
04:22 | First, click on the “Sheet 1” tab. |
04:25 | Here let’s click on the cell referenced as B14 and enter ”Sheet 2”. |
04:33 | You see that the name “Sheet 2” is displayed on the “Input line”. |
04:38 | Now select the text “Sheet 2” in the Input Line. |
04:44 | After selecting the text, click on the “Hyperlink” icon in the toolbar. |
04:51 | The Hyperlink dialog box appears. |
04:55 | On the left side, let’s select the “Document” option. |
04:59 | Click on the “Target in document” icon in the dialog box. |
05:04 | A new “Target in document” dialog box appears. |
05:08 | Now, click on the “plus sign” next to the “Sheet” option. |
05:13 | In the dialog box which appears, click on the “Sheet 2” option. |
05:18 | Now click on the “Apply” button and then click on the “Close” button. |
05:24 | Now, from the Hyperlink dialog box, click on “Apply” and then click on “Close”. |
05:32 | The “Sheet 1” tab appears in front with the text “Sheet 2” highlighted in the cell. |
05:40 | Now, when we click on the text “Sheet 2”, it directly takes us to the sheet where we had entered the balance for Cost. |
05:51 | We have created a hyperlink! |
05:55 | To remove the hyperlink, first select the hyperlinked text “Sheet 2”. |
06:01 | Now right click and from the context menu, click on the “Default Formatting” option. |
06:09 | The the text is no longer hyperlinked. |
06:12 | It is just like any normal text in the document. |
06:16 | Let us undo the changes. |
06:20 | This brings us to the end of the Spoken Tutorial on LibreOffice Calc. |
06:25 | To summarize, we learned how to:
Reference to other sheets in Calc. |
06:31 | Use hyperlinks in Calc. |
06:36 | Watch the video available at the following link |
06:40 | It summarises the Spoken Tutorial project |
06:43 | If you do not have good bandwidth, you can download and watch it |
06:47 | The Spoken Tutorial Project Team
Conducts workshops using spoken tutorials. |
06:52 | Gives certificates for those who pass an online test |
06:56 | For more details, please write to contact at spoken hyphen tutorial dot org |
07:03 | Spoken Tutorial Project is a part of the Talk to a Teacher project |
07:07 | It is supported by the National Mission on Education through ICT, MHRD, Government of India |
07:15 | More information on this Mission is available at
spoken hyphen tutorial dot org slash NMEICT hyphen Intro |
07:25 | This tutorial has been contributed by DesiCrew Solutions Pvt. Ltd
Thanks for joining |